Every source behind this page, what it is used for and its terms. The tags on the page (GOV, FINAL, …) link here. Report figures are restated as facts with citation; no figures or images from the reports are reproduced.
Gobierno de España, committee for the analysis of the 28 April crisis, approved by the Council of Ministers on 17 June 2025. Press release.
Used for: the millisecond timeline, voltages and frequencies in the replay, the morning events, the system state at 12:30, load‑shedding thresholds and the committee's findings.
Terms: Spanish public‑sector information, reusable under Ley 37/2007 with citation and without distorting it.
Grid Incident in Spain and Portugal on 28 April 2025, 20 March 2026. Panel of 49 experts from ACER, national regulators, TSOs and RCCs.
Used for: causes, the 727 MW and 928 MW trip totals, the 0.63 Hz oscillation, the RoCoF statement, the inertia and reactive‑margin simulations, reactive‑power compliance findings. Checked against the report PDF (pages 11–22).
Terms: reuse terms not stated; facts cited, nothing reproduced.
3 October 2025. Facts only, no root causes.
Used for: about 525 MW of early losses, about 2.5 GW lost by 12:33:18, loss of synchronism from 12:33:19, the unit not replaced on the morning of the 28th.
Terms: reuse terms not stated; facts cited.
System Operation European Stakeholder Committee, 4 June 2025. Preliminary.
Used for: ENTSO-E's collapse time of 12:33:24, Portugal's load shedding.
Terms: reuse terms not stated; facts cited.
Blackout in Spanish Peninsular Electrical System the 28th of April 2025, 18 June 2025, and press release.
Used for: REE's position on compliance, scheduling and inertia.
Terms: REE legal notice (see REE data below).
Press release, 20 March 2026, the day the final report was published.
Used for: REE's reading of the final report.
Terms: REE legal notice.
AELEC (Iberdrola, Endesa, EDP)
As reported by Ara.cat and E&T / Reuters, 2025.
Used for: the utilities' position.
Terms: press reports, paraphrased with short quotes.
El Español, interview with José Bogas
Endesa CEO, 12 February 2026.
Used for: a short quote on REE's scheduling.
Terms: press, short quote with attribution.
Comisión Nacional de los Mercados y la Competencia: June 2025 P.O. 7.4; DCOOR/DE/006/26 of 10 July 2026. Summary by UNEF.
Used for: the rule changes since the blackout.
Terms: Spanish public‑sector information, Ley 37/2007.
"Seguimiento de la demanda", peninsular Spain, 5‑minute values for 22, 28 and 29 April 2025, retrieved 16 October 2026 (the days are closed; REE gives no later update date for this feed). Cross‑checked against REE's REData API.
Used for: every demand curve, the generation mix and the exports at 12:30.
Terms: REE legal notice: may be published on a website for informational, non‑commercial purposes, naming REE as the source, without altering the data, and stating the date. Source: Red Eléctrica.
"The Iberian Blackout: A Black Swan or a Gray Rhino?", November 2025. Academic analysis, not an official report.
Used for: the inertia range at 12:30 (citing the Factual Report).
Terms: arXiv preprint; cited, nothing reproduced.
23 March 2026, and pv magazine the same day.
Used for: background on the final report; every figure used was then checked in the report itself.
Terms: press, cited.
Kundur, Power System Stability and ControlKundur
P. Kundur, McGraw‑Hill, 1994. Table 3.2 (typical inertia constants) and chapter 11 (load self‑regulation).
Used for: the inertia constant of each technology and the load‑damping factor in the model.
Terms: textbook, cited.
Annex: automatic low‑frequency demand disconnection for Continental Europe.
Used for: load‑shedding shares: 5% of load at 49.0 Hz, 45% cumulative at 48.0 Hz, at least 6 steps, at most 10% per step.
Terms: EU law, © European Union, reuse authorised with acknowledgement.
ENTSO-E, FCR explanatory note and LFSM guidance (NC RfG)
ENTSO-E guidance on frequency containment reserves and limited frequency‑sensitive modes.
Used for: the 3,000 MW reference incident, FCR fully deployed at ±0.2 Hz within 30 s, LFSM activation at 49.8 / 50.2 Hz.
Terms: cited.
Network code on requirements for grid connection of generators: frequency ranges generators must ride through.
Used for: the 51.5 Hz upper limit in the game.
Terms: EU law, © European Union, reuse authorised with acknowledgement.
ENTSO-E, SAFA Policy on Emergency and Restoration
Used for: Continental Europe's load‑shedding design and reconnection above 49.8 Hz.
Terms: cited.
NREL slides on the Iberian blackout
National Renewable Energy Laboratory, 2025 (docs.nrel.gov 95103).
Used for: system inertia of 2.3 s at 12:30, against a 2 s floor, used to calibrate the model.
Terms: US government work, cited.
REN, AEMET and EDMO on the "atmospheric" claim
REN statement as reported by AFP and Euronews (April 2025); AEMET (Spanish weather agency) statement; European Digital Media Observatory fact‑check.
Used for: the atmospheric‑vibration myth card.
Terms: press and public statements, paraphrased.
Maldita.es, citing REE
Fact‑check on the solar share, 2025.
Used for: solar at 51% at 12:30 on 22 April, which REE's own data reproduces (17,167 MW of about 33.7 GW).
Terms: press, cited.
Used for: the typefaces, served by Google Fonts.
Licence: SIL Open Font License 1.1.